close
Categories
Filter By
Brand
Division
Gross Weight (lbs.)
- 0.05 1
- 0.10 1
- 0.16 1
- 0.25 1
- 0.35 1
- 0.50 3
- 0.59 1
- 0.60 1
- 0.65 1
- 0.67 2
- 0.71 1
- 0.75 3
- 0.90 1
- 0.97 1
- 1.00 5
- 1.10 1
- 1.15 1
- 1.24 1
- 1.30 1
- 1.33 1
- 1.34 2
- 1.42 3
- 1.48 2
- 1.50 2
- 1.58 3
- 1.59 1
- 1.60 2
- 1.62 3
- 1.67 3
- 1.70 2
- 1.71 1
- 1.75 2
- 1.76 1
- 1.77 1
- 1.83 1
- 1.85 1
- 1.93 2
- 1.94 1
- 1.95 1
- 10.00 1
- 10.50 1
- 11.00 1
- 11.50 1
- 12.00 2
- 12.19 1
- 12.80 1
- 13.25 1
- 14.10 1
- 14.50 1
- 15.00 3
- 15.50 1
- 17.00 1
- 18.00 1
- 18.20 1
- 19.00 1
- 2.00 3
- 2.05 1
- 2.10 2
- 2.20 1
- 2.25 1
- 2.32 1
- 2.50 1
- 2.53 2
- 2.80 2
- 20.50 1
- 22.00 2
- 23.00 1
- 25.50 1
- 29.00 1
- 3.00 1
- 3.08 1
- 3.10 1
- 3.15 1
- 3.48 1
- 3.50 3
- 3.75 2
- 3.80 2
- 3.85 1
- 3.98 1
- 30.00 1
- 32.00 1
- 32.50 1
- 37.00 1
- 39.50 1
- 4.00 2
- 4.50 2
- 4.60 1
- 4.73 1
- 41.00 1
- 42.50 1
- 5.00 2
- 5.13 1
- 5.20 1
- 5.30 1
- 5.60 1
- 5.67 1
- 5.94 1
- 56.00 1
- 6.00 1
- 6.03 1
- 6.25 1
- 6.34 1
- 6.50 7
- 7.00 4
- 7.27 1
- 7.44 1
- 7.50 3
- 7.67 1
- 7.97 1
- 8.00 3
- 8.17 1
- 8.20 1
- 8.50 1
- 8.67 1
- 8.80 1
- 9.00 3
- 9.50 1
- 9.67 1
- 90.00 1
- 95.00 1
- 989.00 1
Height (in.)
Length (in.)
Warranty
Width (in.)
0.59, 2.20, 15.00 - Manufactured Housing
5 items
Xi2 Ground Pad for Perimeter Beam
59305PH
Steel Pad for Xi2 Ground Foundation Installation for Perimeter Frame
- USD
Black Paint Double Tension Head Model #MIDH
59100
Enhance the strength and reliability of your construction projects with Tie Down's Double Tension Head. This advanced tensioning system is a standard feature on all our tension head anchors, ensuring maximum performance and security for both frame and roof ties. The Double Tension Head is engineered to withstand tough conditions and provide exceptional tensioning capabilities. The strap bolts are designed with a square lock head, securely locking every fourth of a turn, guaranteeing a firm and steadfast connection. Choose from two durable finish options: a sleek black paint finish or a corrosion-resistant galvanized finish, both ensuring long-lasting protection and enhanced durability.
- USD
(30 Per pallet) FOUNDATION SYSTEMS XI2 STEEL PIER LONGITUDINAL SYSTEM Steel Pier Pad Only Part ID: 59326
59326
Xi2 Steel Pier Ground Pad
- USD
Steel Gound Pad
59305
Steel Pad for Xi2 Ground Foundation Installation
- USD
14 ft. FRAME TIE WITH HOOK (MHT14)
59214
Tie Down's Frame Tie with Hook offers a quick and secure solution for installing frame ties with ease. Crafted from heavy-duty 1/4 inch steel, the robust hook ensures a strong and reliable connection to the frame, guaranteeing the safety and stability of your structure. This frame tie is constructed with certified galvanized steel strapping, adhering to the stringent NCS BCS A225.1 (ANSI A119.3) and HUD specifications. The galvanized coating provides excellent protection against corrosion, making it suitable for various environmental conditions. Choose from multiple options to suit your needs, available in boxes of 30 or 50 as well as 8 per bundle. The frame ties are offered in various lengths, ranging from 6 feet to 16 feet, allowing you to select the perfect fit for your project.
- USD
1 - 5 of 5
1
testing